SBC Center Recent Construction Photos
Posted on September 26, 2001

Precast concrete risers set at the Upper Concourse Level in the southeast quadrant.


Placing steel for a raker beam in the northeast quadrant. To date, 2,956 tons of steel placed (419 miles).


Northeast quadrant raker and truss beam installation.


Pouring concrete at the northwest quadrant Terrace Level. 29,626 cubic yards poured to date or 3,292 truck loads.


Formwork at the northwest quadrant Terrace Level and forming of the columns on the southwest quadrant Main Concourse Level.


Formwork and reinforcing steel installation at the east end of the Courtside Club Level Spurs Administrative Offices.